https://hdc.com.mv/app/files//2017/07/General-Specifications-for-Plastering-Painting.pdf
Curing shall be started 24 hours after finishing the plaster. The plaster shall be kept wet for a period of seven days. During this period it shall be suitably protected for all damages, at the contractor’s expense by such means as the officer rin rcharge may approve. 12.2 LIME CEMENT PLASTER 15 mm THICK
https://www.quora.com/How-many-m2-of-plaster-day-can-one-do-manually
Answer (1 of 2): 1 skilled mason with 1 helper can cover 40 to 50 m2 per day (08 hours). If all the required material (tools, fine aggregates, cement & water ) present near the working area. It also depends upon incentives or overtime. we can get more production
https://www.instituteforapprenticeships.org/apprenticeship-standards/plasterer/
Solid plastering work includes preparing solid backgrounds by hand and mechanical means and installing sheet materials such as expanded metal lath/rib lath, standard angle beads, skim beads, stop beads, expansion beads and reinforcements for the application of one, two or …
https://www.thefis.org/?td_restrict_media_path_by_role=/wp-content/uploads/2015/10/Technical-Note-Standards-for-Plaster-Finish.pdf
the flatness of plaster finish, application, design and inspection of plaster systems. Other standards that should be used when considering standards for a plaster skim finish: • BS EN 13964-2014 is the recently published current definitive standard for the manufacture and installation of suspended systems.
https://www.troublefreepool.com/threads/ten-guidelines-for-quality-pool-plaster.41414/
Generally, a plaster crew should spend at least four hours or more to plaster a typical residential pool. If it takes only three hours, that might mean it was done too fast and may result in plaster problems appearing later.
https://hoursfinder.com/e-hours/european-lathing-plastering-hours.html
Jan 31, 2001 · 6. Spread the plaster onto the pre-wetted laths at about 10mm, rule off and leave. Do not attempt to work the plaster at this stage as it will only stick to the trowel. 7. Keep an eye on the plaster and, after about three hours (longer on a cold or wet day), the surface will start to take a …