https://www.txdot.gov/inside-txdot/media-center/local-news/tyler/049-2021.html
The project includes pavement widening, hot mix asphalt concrete overlay, signs, and pavement markings.-----I-20 Total Maintenance Contract. Limits: Gregg, Smith and Van Zandt counties; Contractor: Firemen Excavation, maintenance activities, follow up action worksheet summary for bridge work repair in Gregg, Smith and Van Zandt Counties.
http://www.vanzandtcounty.org/upload/page/2685/2021%20Home/Van%20Zandt%20County%20Permit%20for%20Installation%20of%20Culverts%2010%2019%2020%20revised.pdf
7. Van Zandt County may undertake actions deemed necessary to correct drainage or safety problems related to existing or new driveway facilities up to and including the immediate removal of the driveway. If such removal is a result of non-compliance with this permit, labor will be charged to the Applicant at a rate of $200.00 per hour. 8.
https://www.txdot.gov/inside-txdot/media-center/local-news/tyler/047-2021.html
The project includes pavement widening, hot mix asphalt concrete overlay, signs, and pavement markings.-----I-20 Total Maintenance Contract •Limits: Gregg, Smith and Van Zandt counties •Contractor: Firemen Excavation, maintenance activities, follow up action worksheet summary for bridge work repair in Gregg, Smith and Van Zandt Counties.
https://www.ktre.com/2021/05/24/roadwork-week-may/
Work hours for this project will be from 8 p.m. to 5 a.m., Sunday through Thursday nights. Expect lane closures and delays. The project consists of pavement resurfacing.
https://www.kltv.com/2021/11/10/roadwork-week-nov-8/
No work is scheduled. When in progress, hours will be from 8 p.m. to 5 a.m., Sunday through Thursday nights. The project will resurface the roadway, upgrade drainage structures, and repair bridge joints. Sidewalks at various locations in Smith County. Limits: SH 64 in Tyler (Entrada Ln. to Parkdale Dr.); SH 110 in Troup (CR 2138 to FM 347);
https://www.palestineherald.com/news/txdot-project-updates-for-the-week-of-nov-15-2021/article_e4b57db8-441b-11ec-89e6-4f044575a6a1.html
When in progress, hours will be from 8 p.m. to 5 a.m., Sunday through Thursday nights. The project will resurface the roadway, upgrade drainage structures, and repair bridge joints. Sidewalks at ...
https://theasphaltpro.com/articles/california-company-tracks-recycling/
Van Zandt is the operations manager for FTG Construction Materials in Lodi, California, and already had one brand in his mind that had intrigued him for some time. All down the Golden State’s I-5 freeway, most major contractors were crushing on the fly with Fast Trax FT4250 impact crushers from KPI-JCI and Astec Mobile Screens, Yankton, South ...