https://www.generatorsource.com/NFPA-110-Generator-Requirements.aspx
Standby - 60 to 70% of the rating for 24-hour periods up to 500 hours per year operating time. Emergency Standby - 60 to 70% of the rating for 24-hour periods up to 200 hours per year operating time. Prime - 60 to 70% of the rating for extended periods with 10% overload for one hour, with unlimited operating hours.
https://www.colorado.edu/firelifesafety/content/emergency-and-indoor-generators-pdf
Fire Code requires that emergency generators be stationary generators. Therefore, a portable generator would not be allowed to be used as an emergency generator. The following code review lists the requirements for indoor use of both portable and stationary generators. Both require a minimum of 1 hour fire rated construction and an exhaust system.
https://dsps.wi.gov/Documents/Programs/ElectricalLighting/FAQEmergencyStandbyPowerSystemsPowerPoint.pdf
The Class is the minimum time in hours the system is designed to run. Class Minimum operation time .083 .083 hours (5 minutes) .25 .25 hours (15 minutes) 2 2 hours 6 6 hours 48 48 hours X Other time, in hours, as required by code or userFile Size: 1MB
https://www.connexusenergy.com/safety/generators
Home Generators Portable generators are often used for a backup power supply in the event of an emergency power outage. Improper use or installation of an electric generator can cause property damage, serious injury, or even death.
https://www.safetypower.ca/static/img/pdf/epa-requirements-for-emergency-engines.pdf
emergency situation. In general a total of 100 hours per year is allocated to emergency generators for maintenance and testing. Of these 100 hours the EPA currently allows up to 50 hours to be used for demand response programs in some jurisdictions – but this …
https://www.health.state.mn.us/facilities/regulation/engineering/docs/lscgensets.pdf
1.5 continuous hours [see NFPA 110(10), Sec. 8.4.2.3]. b) Spark-ignited generator sets (e.g. gasoline-powered, natural gas-powered or propane- powered) must be exercised at least once a month with the available load for 30 minutes
https://woodstockpower.com/blog/what-are-the-requirements-for-hospital-backup-generators/
Furthermore, hospitals must store enough fuel on-site to keep generators running for a total of 96 hours, in case a power outage lasts for days. If you follow the testing and maintenance guidelines listed above, there should be no cause for concern here.