If the denominator level of activity is 4200 machine hours ...

    https://www.coursehero.com/file/p50cd05j/If-the-denominator-level-of-activity-is-4200-machine-hours-the-variable-element/
    71. If the denominator level of activity is 4,200 machine-hours, the variable element in the predetermined overhead rate would be: A. $11.60 B. $66.22 C. $76.28 D. $77.82 72. If the denominator level of activity is 4,200 machine-hours, the fixed element in the predetermined overhead rate would be: A. $11.60 B. $1,160.00 C. $66.22 D. $77.82 73.

fixed overhead volume (denominator) variance Barrons ...

    https://www.allbusiness.com/barrons_dictionary/dictionary-fixed-overhead-volume-denominator-variance-4951092-1.html
    The budgeted fixed overhead costs are then $30,000 (5000 denominator hours ¥ $6). The standard machine-hours allowed was 4000. The fixed overhead volume variance is (5000 – 4000) ¥ $6 = $6000, which is unfavorable because of the company’s failure to operate at the budgeted (denominator) activity level.

If the denominator level of activity is 7500 machine hours ...

    https://www.coursehero.com/file/p15g9ta/If-the-denominator-level-of-activity-is-7500-machine-hours-the-fixed-element-in/
    Sep 20, 2013 · View full document. See Page 1. If the denominator level of activity is 7,500 machine-hours, the fixed element in the predetermined overhead rate would be: A) $192.28 B) $211.28 C) $19.00 D) $1,900.00 Ans: A AACSB: Analytic AICPA BB: Critical Thinking AICPA FN: Reporting LO: 5 Level: Easy Solution: Fixed element = $1,442,100 ÷ 7,500 MHs = $192 ...4.9/5

Because a denominator level of 50000 machine hours was ...

    https://www.coursehero.com/file/p111pf/Because-a-denominator-level-of-50000-machine-hours-was-used-in-computing-the/
    upward-sloping line on the graph.) Because a denominator level of 50,000 machine-hours was used in computing the $6.00 rate, the applied-cost line crosses the budget-cost line at exactly 50,000 machine-hours. If the denominator hours and the standard hours allowed for the actual output are the same, there is no volume variance. It is only when the standard hours differ from p. 458

Chapter 9: Absorption/Variable Costing

    https://www.csus.edu/indiv/p/pforsichh/accountinginfo/121/ch09%20-%20abs,%20var%20costing/newch09%20in-class%20problems,%20horngren13e-my%20copy(x2).pdf
    Denominator-level machine-hours 6,000 Standard production rate 50 units per machine-hour Fixed operating costs $1,080,000 Assume standard costs per unit are the same for units in beginning inventory and units produced during the year. Also, assume no price, spendin g, or efficienc y variances. 1.File Size: 274KB

Wangerin Corporation applies overhead to products Chegg.com

    https://www.chegg.com/homework-help/questions-and-answers/wangerin-corporation-applies-overhead-products-based-machine-hours-denominator-level-activ-q28715465
    Apr 23, 2018 · The denominator level of activity is 8,100 machine-hours. The budgeted fixed manufacturing overhead costs are $292,410. In April, the actual fixed manufacturing overhead costs were $298,080 and the standard machine-hours allowed for the actual output were 8,400 machine-hours. Required:

gar003, Chapter 3 Systems Design: Job-Order Costing

    http://www.csun.edu/~hcbus012/acct230/Test%20Bank/Chapter09.doc
    The denominator level of activity is 6,500 machine-hours. The budgeted fixed overhead costs are $242,450. In July, the actual fixed overhead costs were $242,490 and the standard machine-hours allowed for the actual output were 7,000 machine-hours.

determined no information on actual versus flexible budget ...

    https://www.coursehero.com/file/p53qiusi/determined-no-information-on-actual-versus-flexible-budget-machine-hours/
    The choice of the denominator level will affect inventory costs. The new fixed hour. In turn, the allocated amount of fixed manufacturing overhead and the production-volume variance would change as seen below: Actual Budget Allocated $18,050,000 $18,000,000 $21,000,000 $50,000 U $3,000,000 F Flexible-budget variance Prodn. volume variance ...

exam 2 SU 11 & 12 Flashcards Quizlet

    https://quizlet.com/512358116/exam-2-su-11-12-flash-cards/
    The $600,000 was based on a denominator activity level of 40,000 machine hours. There are 0.1 standard machine hours for each bottle of moisturizing cream. 350,000 bottles of moisturizing cream were produced, and 360,000 bottles were sold last year. What was the production volume variance?

Answered: 90,000 units Beginning inventory,… bartleby

    https://www.bartleby.com/questions-and-answers/90000-units-beginning-inventory-january-1-2017-ending-inventory-december-31-2017-34000-units-2017-sa/bd083f77-7bdd-4c5b-b182-b338710903ac
    Jan 01, 2017 · 90,000 units Beginning inventory, January 1, 2017 Ending inventory, December 31, 2017 34,000 units 2017 sales 433,000 units $24.00 per unit Selling price (to distributor) Variable manufacturing cost per unit, including direct materials Variable operating (marketing) cost per unit sold Fixed manufacturing costs $5.40 per unit $1.20 per unit sold $1,852,200 Denominator-level machine-hours 6,300 ...